Efforts
For Increasing Irrigation Potential
The perennial rivers viz. Krishna and Koyana flow throughout the area of
operation of this factory. The water stored in the upper stream is let out in the river
frequently which makes available assured supply of water for lift irrigation.In order to
utilise this full source of potential a separate irrigation cell have been set up at
factory level. This cell have been set up at factory level. This cell by one way remove
the technical defects of existing scheme and brings in increase in area under their
command. By other way survey, execution etc. of new lift irrigation is also done on
priority basis.
A) Sick Sahakari
Lift Irrigation Schemes (Removal of Technical Defects ).
11 Nos. Irrigated Aea 1121 Acres Members 1251 Total HP 730. The details of the
same is as under. |
|
S.No. |
Name of the Scheme |
Irrigable Area Acres |
Hourse Power |
Members |
1. |
Shri
Choundeshwari Sah. Pani
Puravatha Sanstha, Goware |
40 |
40 |
54 |
2. |
Shri
Ganesh Sah. Pani
Puravatha Sanstha Ltd.
Tasawade |
50 |
30 |
60 |
3. |
Shri
Hanuman Sah. Pani
Puravatha Sanstha Ltd.
Tasawade |
60 |
20 |
43 |
4. |
Shri
Yashvant Sah. Pani
Puravatha Sanstha Ltd.
Kavathe |
150 |
70 |
135 |
5. |
Shri
Jotirling Sah. Pani
Puravatha Sanstha Ltd.
Khodad |
40 |
30 |
50 |
6. |
Shri
Maulia Sah. Pani
Puravatha Sanstha Ltd.
Khodad |
40 |
20 |
35 |
7. |
Shri
Jotirling Sah. Pani
Puravatha Sanstha Ltd.
Sakurdi |
56 |
50 |
61 |
8. |
Shri
Bhairavanatha Sah. Pani
Puravatha Sanstha Ltd.
Kharade |
55 |
40 |
57 |
9. |
Shri
Mamata Sah. Pani
Puravatha Sanstha Ltd.
Rikibdarwadi |
80 |
50 |
280 |
10. |
Shri
Hanuman Sah. Pani
Puravatha Sanstha Ltd,
Takale-gujarwadi |
400 |
230 |
226 |
11. |
Shri
Borban Survoday Sah.
Pani Puravatha Sanstha Ltd.
Durgalwadi. |
150 |
150 |
190 |
|
Total (A) |
1121 |
730 |
1251 |
|
|
B)
Lift Irrigation Schemes Sponsered by Sahyadri Sahakari Sakhar Karkhana Ltd.
In order to irrigate un-irrigated lands the Sahyadri Sakhar Karkhana erected following
co-operative Lift Irrigation Schemes with the help of Satara District Central Co-operative
Bank Ltd. And other banks by taking loan on the lands of beneficiary members. The details
of the same are as under
No. of Scheme - 16, Irrigated Area - 17651 Acres, Members - 8017
Total HP - 10870, Total Estimares cost Rs 1844.41 Lacs. |
|
Sr. No. |
Name of Scheme |
Estimated cost in lacs |
Irrigable Area Acres |
Hourse Power |
Members |
1. |
Shri
Umeshwar Lift Irrigation
Scheme, Umbraj. |
288.54 |
2545 |
1680 |
956 |
2. |
Shri
Koteshwar Lift Irrigation
Scheme, Korti. |
66.18 |
1020 |
300 |
676 |
3. |
Shri
Krishnai Lift Irrigation
Scheme, Perale. |
88.65 |
1400 |
500 |
564 |
4. |
Shri
Yashvantaro Chavan Lift
Irrigation scheme, Shirgaon |
294.02 |
2600 |
1825 |
713 |
5. |
Shri
Shriram Lift Irrigation
Scheme, Talbid. |
123.53 |
1800 |
1270 |
760 |
6. |
Shri
Jotirling Lift Irrigation
Scheme, Kiroli. |
55.00 |
450 |
150 |
356 |
7. |
Shri
Umamaheshwar Lift
Irrigation Scheme, Mohitewadi. |
106.58 |
530 |
320 |
164 |
8. |
Shri
Mahadeo Lift Irrigation
Scheme, Varade. |
7.74 |
200 |
72.50 |
105 |
9. |
Shri
Sahyadri Lift Irrigation
Scheme, Shivade. |
5.01 |
75 |
25 |
79 |
10. |
Shri
Jotirling Lift Irrigation
Scheme, Charegaon. |
245.00 |
1760 |
1360 |
1108 |
11. |
Shri
Chandrasen Lift Irrigation
Scheme, Vasantgad. |
185.36 |
1368 |
940 |
744 |
12. |
Shri
Sangam Lift Irrigation
Scheme, Mundhe. |
123.70 |
1125 |
490 |
670 |
13. |
Shri
Bhagvalaxmi Lift Irrigation
Scheme, Arewadi. |
115.40 |
1260 |
1090 |
427 |
14. |
Shri
Naikaba Lift Irrigation
Scheme, Beldare. |
59.60 |
896 |
582.5 |
339 |
15. |
Shri
Sajureshwar Lift Irrigation
Scheme. |
17.10 |
400 |
145 |
211 |
16. |
Shri
Ekeshwari Lift Irrigation
Scheme, Tambave. |
63.00 |
222 |
120 |
145 |
|
Total (B) |
1844.41 |
17651 |
10870 |
8017 |
|
|
Kolhapur
Types Weirs
Krishna river flow village to Khodashi. Kolhapur Type Weir in the area of operation for
length of 30 KM. Inorder to have permanent assured water supply to the Karkhana sponsored
Lift irrigation Schemes as well as private Lift Irrigation Schemes. On recommendations of
the Karkhana Maharashtra Govt. Irrigation Dept. Constructed K.T. weirs as following sites |
|
- Perle-Lakkadwada weir, Perle
- Bhuyachiwadi K.T. Weir, Bhuyachiwadi.
- Konegaon K.T. weir, Konegaon
|
Canal
Irrigation
Arphal Canal runs from K.M. 34 (Rahimatpur) to KM. 85 (Oglewadi) in the area of operation.
Karkhana had made special efforts for early completion of canal work at Govt. Level as a
result in December 1999. The water is released through Arphal Canal in our area of
operation. 14000 hect. Area of villages will be irrigated by the canal irrigation.
The area about 5000 Hect.
Wrong side of the Canal was not irrigated. Hon. Balasaheb Patil, Chairman of Sahyadi
Sahakari Sakhar Karkhana made special efforts at Govt. Level as results following 2 Lift
irrigation Schemes sanctioned by the Govt. of Maharahtra and the above area will be
irrigated by the above Lift Irrigation Schemes. |
|
- Dhangarwadi Lift Irrigation Scheme
15 villagers 2500 Hect. 13.82 crores
- Hanbarwadi Lift Irrigation Scheme.
13 villager 2600 Hect. 14.62
|
TOP |
|